Notice: Fee Changes Jan. 2025
30-Foot Orange Long Lead
$24.95
Description
A long lead is a great tool for exercising and training dogs. Lightweight and easy to coil and carry, this high-visibility, 30-foot orange check cord is soft on your hands, tangle-free to prevent knots that get hung up on brush, will float if submerged and has a heavy-duty brass snap.